NTB-001-241 |
7.6. Lack of information on procedures (or changes thereof) |
2025-03-06 |
Kenya: Mandera |
Kenya |
Resolved 2025-05-30 |
View |
|
Complaint:
|
Tanzania Revenue Authority officers do not seem to have RECTS seals, therefore, demanding for facilitation from transporters. The facilitation includes, Per diem, incidental allowance, in transit allowance and fuel for the government vehicles. |
|
|
Resolution status note:
|
The meeting noted that the complaint was administrative and should be referred to the Committee on Customs for consideration
The meeting noted that the trader did not pay the amount requested of them.
The NTB was referred to SCOC for consideration and resolution |
|
|
Products:
|
6117.90: Parts of garments or clothing accessories, knitted or crocheted, n.e.s. |
|
|
NTB-000-172 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-27 |
Malawi: Dedza |
Malawi |
Resolved 2016-08-24 |
View |
|
Complaint:
|
cumbersome and bureaucratic delays encountered in the processing of documentation and clearing of goods at the border posts. |
|
|
Resolution status note:
|
Malawi reported that she had established trade facilitation tools e.g. Development of OSBPs with Zambia,( Muchinji/Mwami) and Tanzania. Draft agreements have been Mozambique and Malawi were now awaiting Official signing at Ministerial level. Malawi has also developed a one stop Malawi Trade portal with all legal regulations and procedures for all institutions in Malawi that deal with trade in goods. All trade and business related forms and procedures for the respective institutions can be dowloaded from the trade portal. |
|
|
NTB-000-199 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-27 |
Zimbabwe: Zimbabwe Revenue Authority |
Zimbabwe |
Resolved 2011-06-09 |
View |
|
Complaint:
|
Zimbabwe Revenue Authority (ZIMRA) machines are connected to Reserve Bank of Zimbabwe which is linked through the internet to enable them to access approved copies of CDI forms. Serious delays are faced in processing the export documents because the systems are frequently down or unable to connect during working hours. The verification process by RBZ takes too long - up to 3 days. |
|
|
Resolution status note:
|
Zimbabwe reported that there is fallback method in the event that the system is down. The CD1s are processed manually and are captured later in the excel spreadsheet which is then forwarded electronically to RBZ on weekly basis. There is therefore no delay in processing export documents |
|
|
NTB-000-149 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-27 |
Tanzania: Tanzania Revenue Authority |
Tanzania |
Resolved 2011-07-28 |
View |
|
Complaint:
|
Despite efforts to improve the situation, customs procedures in Tanzania are cumbersome. In most cases, depending on the type of product, there is a long verification chain that involves many steps and numerous documents have to be handled/exchanged in the process of importing. |
|
|
Resolution status note:
|
Tanzania Revenue Authority reported that all customs documentation are now obtained and processed online. Traders engage Clearing Agents for clearing goods who obtain all documents online. |
|
|
NTB-000-132 |
2.8. Lengthy and costly customs clearance procedures Policy/Regulatory |
2009-07-26 |
South Africa: South Africa Revenue Services |
Eswatini |
Resolved 2012-04-26 |
View |
|
Complaint:
|
South Africa is charging a fine of E1000.0 per set of customs documents for documents not acquitted within a month. |
|
|
Resolution status note:
|
At the 3rd meeting the Tripartite NTBs Focal Points and NMC Chairs held in Dar -es-Salaam on 19-20 April 2012,South Africa reported that this is a standing transit regulation. Swaziland and South Africa agreed that South Africa would provide the regulation for distribution to stakeholders. It was therefore resolved that the NTB be considered resolved. |
|
|
NTB-000-374 |
2.8. Lengthy and costly customs clearance procedures |
2010-02-10 |
COMESA |
Zimbabwe |
Resolved 2019-10-12 |
View |
|
Complaint:
|
Lack of a SADC simplified trading regime hampers small traders from doing business with their SADC counterparts. |
|
|
Resolution status note:
|
During the national Workshop to launch SMS tool for Zimbabwe and training on online system, held on 10- 12 October 2019, Zimbabwe reviewed all outstanding NTBs and reported that SADC had made progress in developing the SADC STR and therefore this resolves the issue. |
|
|
NTB-000-120 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
Seychelles: Ministry of Trade |
Seychelles |
Resolved 2010-07-29 |
View |
|
Complaint:
|
The administrative procedures for issuing import licences require improved efficiency |
|
|
Resolution status note:
|
Seychelles reported that Infrastructural and human resources limitations being addressed |
|
|
NTB-000-356 |
2.8. Lengthy and costly customs clearance procedures |
2010-02-10 |
Tanzania: Tanzania Revenue Authority |
Tanzania |
Resolved 2011-07-28 |
View |
|
Complaint:
|
Customs officers arbitrarily verify goods in transit at various check points and break seals for 100% physical verification leading to delays, breakages for goods thinly packed in the container etc. Customs could communicate with the next customs point at the border for verification to avoid 100% verification along the way. In some instances, the verification would have taken place at the point of loading the goods. |
|
|
Resolution status note:
|
Tanzania Revenue Authority reported that there are only two check points in Misubusubu and at Makambako to check only the if truck abides by transit time and transit route. TRA does not break any seals. If any seal is tempered with transporter is supposed to notify TRA office, transit check point or the nearest police station. All transit check points are automated under asycuda so they can be monitored in the system. TRA is in the process of acquiring electronic cargo tracking system hence check points will go away. |
|
|
NTB-000-352 |
2.8. Lengthy and costly customs clearance procedures Policy/Regulatory |
2010-02-10 |
SADC |
Namibia |
Resolved 2011-11-10 |
View |
|
Complaint:
|
The cabotage law applied by SADC Member states contributes to high transport costs. The law does not allow an empty truck to carry back a load from a third country. For example, a South African truck dropping off a load in Namibia cannot pick up a load in Namibia destined for Botswana even though this truck is using trans Kalahari Highway linking the two countries |
|
|
Resolution status note:
|
SADC secretariat responded that : the customs term cabotage as stated in Specific Annex E, Chapter 3 of the revised Kyoto Convention, is applied for imported goods that have not been declared under the condition that they must be transported in a vessel other than the importing vessel in which they arrived in the Customs territory are loaded on board a vessel at a place in the Customs territory and are transported to another place in the same Customs territory where they are then unloaded and cleared. The term can also be used for the same purposes for air transportation (domestic flights).
Looking to the complaint technically, one of the SADC Secretariat key objectives is to reduce the costs of doing business in the region. However, some interventions of the Secretariat are bounded by its regional economic integration process. SADC is currently a FTA among its 11 Member States, enabling goods originating in Member States applying the FTA to enter duty free and quota free under certain conditions stated in the SADC Protocol on Trade. For this economic activity, economic operators are not obliged to be registered as economic operators in the countries were goods are delivered. A deeper regional economic integration would be needed in order to allow foreign economic operators to engage in business activities in Member States, benefiting from local business opportunities but also fiscal obligations. This is a level of economic integration closer to common market and which unfortunately, the SADC Protocol on Trade does not provide for. |
|
|
NTB-000-328 |
2.8. Lengthy and costly customs clearance procedures Policy/Regulatory |
2009-09-09 |
Eswatini: Revenue Authority |
Eswatini |
Resolved 2011-06-06 |
View |
|
Complaint:
|
The customs declaration system linking Swaziland Borders is not automated. |
|
|
Resolution status note:
|
Swaziland reported that the Swaziland Revenue Authority (SRA) started operating in January 2011 and replaces the Department of Customs and Excise. The organization is therefore fairly new and is still in process of developing appropriate customs clearances procedures which will be uniformly applied at all border posts. This also applies to recruitment and training of staff which is still is ongoing to reach the desired levels which will bring efficiencies in the provision of service at all borders. |
|
|
NTB-000-121 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
Seychelles: Customs |
Eswatini |
Resolved 2011-06-03 |
View |
|
Complaint:
|
There is total lack of consistency in the application of customs procedures at all clearing offices. |
|
|
Resolution status note:
|
Seychelles reportd that the situation has much improved with ASYCUDA++ |
|
|
NTB-000-253 |
2.8. Lengthy and costly customs clearance procedures |
2009-09-08 |
Angola: Ondjiva Customs |
Namibia |
Resolved 2011-11-30 |
View |
|
Complaint:
|
Clearance of goods by the Ondjiva customs at the Oshikango/Santa Clara border post is too time consuming (red tape/inefficient bureaucracy). |
|
|
Resolution status note:
|
During the NTBs national workshop held in Angola on 30 November 2011, Angola reported that its Customs service underwent a structural reform and modernisation resulting in the simplification and harmonisation of customs procedures. Clearance of goods takes maximum 48 hours, if documentation is properly submitted. |
|
|
NTB-000-230 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-28 |
Namibia: Namibia Revenue Authority |
Namibia |
Resolved 2011-03-09 |
View |
|
Complaint:
|
Border delays due to documentation and customs procedures. |
|
|
Resolution status note:
|
Namibia reported that the Ministry of Finance have so far appointed 61 entry level staff and interviews are still ongoing senior positions up to April 2011
|
|
|
NTB-000-230 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-28 |
Namibia: Namibia Revenue Authority |
Namibia |
Resolved 2011-03-09 |
View |
|
Complaint:
|
Border delays due to documentation and customs procedures. |
|
|
NTB-000-092 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
Tanzania: Dar-es-Salaam Port |
Mauritius |
Resolved 2011-05-23 |
View |
|
Complaint:
|
Tanzania demands pre-shipment inspection for exports from Mauritius. The lack of appointed inspection company in Mauritius makes abiding to the requirements of pre-inspection difficult. |
|
|
Resolution status note:
|
Tanzania reported that there is no pre-shipment inspection for exports from Mauritius. |
|
|
NTB-000-090 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
South Africa: SouthAfrica Revenue Services |
Mauritius |
Resolved 2011-03-09 |
View |
|
Complaint:
|
There are delays in VAT refunds for Mauritian importers of South African goods. It is also not clear whether the VAT refunds re only for those companies that use South African imports. |
|
|
Resolution status note:
|
South Africa reported that this is no longer existing |
|
|
NTB-000-090 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
South Africa: SouthAfrica Revenue Services |
Mauritius |
Resolved 2011-03-09 |
View |
|
Complaint:
|
There are delays in VAT refunds for Mauritian importers of South African goods. It is also not clear whether the VAT refunds re only for those companies that use South African imports. |
|
|
Resolution status note:
|
South Africa reported that this is no longer existing |
|
|
NTB-000-090 |
2.8. Lengthy and costly customs clearance procedures |
2009-07-26 |
South Africa: SouthAfrica Revenue Services |
Mauritius |
Resolved 2011-03-09 |
View |
|
Complaint:
|
There are delays in VAT refunds for Mauritian importers of South African goods. It is also not clear whether the VAT refunds re only for those companies that use South African imports. |
|
|
Resolution status note:
|
South Africa reported that this is no longer existing |
|
|
NTB-000-252 |
2.8. Lengthy and costly customs clearance procedures |
2009-09-08 |
Namibia: Revenue Authority |
Namibia |
Resolved 2011-05-11 |
View |
|
Complaint:
|
Customs Clearing process at the Oshikango/Santa Clara border is very long. |
|
|
Resolution status note:
|
The Ministry of Finance recruited 41 staff members as of January 2011 in an effort to clear up the Customs Clearance process. |
|
|
NTB-000-365 |
2.8. Lengthy and costly customs clearance procedures |
2010-02-10 |
Zambia: Matumbo and Chinsali |
Zambia |
Resolved 2010-07-30 |
View |
|
Complaint:
|
Inland Zambia State Police request for customs documents at Road Blocks (Matumbo, Chinsali) creating unnecessary delays. |
|
|
Resolution status note:
|
Zambia reported that it’s a requirement for security purposes, which applies to both locals and international road users. |
|