Resolved complaints

Showing items 121 to 140 of 799
Complaint number NTB Type
Category 1. Government participation in trade & restrictive practices tolerated by governments
Category 2. Customs and administrative entry procedures
Category 5. Specific limitations
Category 6. Charges on imports
Category 7. Other procedural problems
Category 8. Transport, Clearing and Forwarding
Check allUncheck all
Date of incident Location
COMESA
EAC
SADC
Reporting country or region (additional)
COMESA
EAC
SADC
Status Actions
NTB-000-216 8.7. Costly Road user charges /fees 2009-07-27 SADC Zimbabwe Resolved
2016-10-07
View
Complaint: Toll fees variation within the region hampers smooth transit of goods. Toll fees should be rationalised.  
Resolution status note: FESARTA reported that the NTB does not exist at present.  
NTB-000-212 1.1. Export subsidies
A9: SPS measures n.e.s.
2009-07-27 Lesotho: Ministry of Trade Zimbabwe Resolved
2011-07-28
View
Complaint: Unreasonable SPS requirements with no scientific basis or excessively averse to risk  
Resolution status note: Lesotho reported that the import license for agricultural products is required to ensure food safety and to prevent the spread of diseases and insects. It takes a day for a license to be issued, at the Department of Agriculture. Information on SPS requirements is readily available from the Department of Agriculture.  
NTB-000-213 1.1. Export subsidies
A14: Authorization requirement for sanitary and phytosanitary reasons for importing certain products
2009-07-27 Lesotho: Ministry of Agriculture Zimbabwe Resolved
2011-07-28
View
Complaint: delays in getting SPS approvals  
Resolution status note: Lesotho reported that the import license for agricultural products is required to ensure food safety and to prevent the spread of diseases and insects. It takes one day for a license to be issued, at the Department of Agriculture. Information on SPS requirements is readily available from the Department of Agriculture  
NTB-000-214 1.1. Export subsidies
A9: SPS measures n.e.s.
2009-07-27 Lesotho: Ministry of Agriculture Zimbabwe Resolved
2011-07-28
View
Complaint: Difficulty in accessing information onSPS requirements  
Resolution status note: During the workshop establishing NMC for Lesotho held on 09 August 2011 in Maseru, it was confirmed that information on SPS requirements is available from the Ministry of Agriculture and that arrangements are in place to upload this information onto the website of the TMinistry of Trade & Industry Cooperation & Marketing.  
NTB-000-186 7.9. Inadequate trade related infrastructure 2009-07-27 Mozambique: Beira Port Malawi Resolved
2012-04-26
View
Complaint: Poor infrastructure. Many delays at Beira and Nacala docks due to heavy traffic and no security available  
Resolution status note: At the 3rd Tripartite NTBs Focal Point point meeting Malawi registered that the issue be resolved considering the submission from Mozambique that the delays, were as a result of procedural matters between the clearing agents and their respective clients and not the Beira Port authorities per se.  
NTB-000-192 7.9. Inadequate trade related infrastructure
Policy/Regulatory
2009-07-27 Mozambique: Beira Port Malawi Resolved
2011-09-23
View
Complaint: Inefficient loading and unloading facilities at Nacala and Beira ports in Mozambique resulting in time delays and occasionally additional warehousing costs.  
Resolution status note: In consultations with the Beira Port Authorities, namely, Cornelder, on the 22nd of September 2011, at the Beira Port, Cornelder informed that indeed during the dredging process the Beira port faced a lot of delays but that aspect has been overcome now that the dredging process is over.  
NTB-000-149 2.8. Lengthy and costly customs clearance procedures 2009-07-27 Tanzania: Tanzania Revenue Authority Tanzania Resolved
2011-07-28
View
Complaint: Despite efforts to improve the situation, customs procedures in Tanzania are cumbersome. In most cases, depending on the type of product, there is a long verification chain that involves many steps and numerous documents have to be handled/exchanged in the process of importing.  
Resolution status note: Tanzania Revenue Authority reported that all customs documentation are now obtained and processed online. Traders engage Clearing Agents for clearing goods who obtain all documents online.  
NTB-000-154 2.8. Lengthy and costly customs clearance procedures 2009-07-27 Tanzania: Tanzania Bureau of Standards Tanzania Resolved
2011-07-28
View
Complaint: Delays and high cost of screening honey. Tanzania Bureau of Standards takes from 3 to 4 weeks with constant follow up; 20 items are screened on payment of T50,000/-  
Resolution status note: Tanzania Bureau of Standards reported that there is some improvement on the dwell time at TBS Test house. There has been an influx of samples in the food sector which has resulted in companies having to wait for maximum 1-2 weeks. The current capacity of the conformity infrastructure (soft and hard), has necessitated that TBS Laboratory applies a first come first attended procedure. TBS encourages the business community not to wait until the last hour before they lodge their enquiry.

2. The cost of conducting an analysis is determined by the type of analysis to be conducted and therefore the cost of the reagents which goes up with time. Example, the current (2011) analysis cost for Honey is 160,000.00Tanzanian Shillings per sample.
 
NTB-000-156 7.9. Inadequate trade related infrastructure 2009-07-27 Tanzania: Along major highways Tanzania Resolved
2012-06-15
View
Complaint: Weighing equipment in some stations is sometimes faulty, meaning that even when a truck has a proper seal, weight readings at different stations vary. Also, there are numerous stations along the major highways, which do not respect seals even when it is clear that such seals have not been tempered with. The most notorious stations are along Moshi and Kibaha on Nairobi-Dar-es-salaam highway.  
Resolution status note: The 10th meeting of SADC Committee on Trade Facilitation accepted Tanzania's explaination that problem arose due to packaging and loading of containers at the port. If containers are not properly packed, goods move while on transit and affect weigh on an axle. Distribution of weight on an axle may be correct at point of departure, but after some distance, it may change as cargo moves. Since weighing is on axles not cargo, different numbers may be recorded at
a weigh bridge. It was reported that sensitization was already being undertaken to alert traders to reduce the possibility of movement of goods inside containers while in transit by packing properly. The meeting therefore agreed to consider the NTB resolved.
 
NTB-000-158 1.1. Export subsidies
A82: Testing requirement
2009-07-27 Tanzania: Ministry of Agriculture Tanzania Resolved
2016-05-18
View
Complaint: Cumbersome procedures for , SPS certificates and the permits.The Ministry utilitises its own laboratories in Dar es Salaam with support from Tropical Pesticide Research Institute in Arusha which takes even more time.  
Resolution status note: The procedures are being streamlined  
NTB-000-159 4.1. Issues related to sanitary and phyto-sanitary measures
A83: Certification requirement
2009-07-27 Tanzania: Ministry of Health Tanzania Resolved
2011-08-30
View
Complaint: Cumbersome certification procedures for certification of milk inputs.Certification officers are based in Dar es Salaam and going to Tunduma for verification is very cumbersome  
Resolution status note: Tanzania Revenue Authority reported that TRA does random physical verification as part of risk management analysis before clearing mainly on textiles motor vehicles.  
NTB-000-160 1.1. Export subsidies
A82: Testing requirement
2009-07-27 Tanzania: Tanzania Bureau of Standards Tanzania Resolved
2011-08-28
View
Complaint: Exports go through unnecessary, onerous and costly testing and documentation procedures, since the TBS, TFDA, Ministry of Health and Tanzania atomic energy authority each have to issue export certification on every export consignment.  
Resolution status note: Tanzania Revenue Authority reported that TRA does random physical verification as part of risk management analysis before clearing and this is done mainly on textiles motor vehicles.  
NTB-000-160 1.1. Export subsidies
A82: Testing requirement
2009-07-27 Tanzania: Tanzania Bureau of Standards Tanzania Resolved
2011-08-28
View
Complaint: Exports go through unnecessary, onerous and costly testing and documentation procedures, since the TBS, TFDA, Ministry of Health and Tanzania atomic energy authority each have to issue export certification on every export consignment.  
Resolution status note: Tanzania reported that Tanzania Institutions have been established and governed by Laws. The process of establishing Testing procedures under one roof is underway.  
NTB-000-160 1.1. Export subsidies
A82: Testing requirement
2009-07-27 Tanzania: Tanzania Bureau of Standards Tanzania Resolved
2011-08-28
View
Complaint: Exports go through unnecessary, onerous and costly testing and documentation procedures, since the TBS, TFDA, Ministry of Health and Tanzania atomic energy authority each have to issue export certification on every export consignment.  
Resolution status note: Tanzania reported that Tanzania Institutions have been established and governed by Laws. The process of establishing Testing procedures under one roof is underway. Tanzania Revenue Authority reported that TRA does random physical verification as part of risk management analysis before clearing and this is done mainly on textiles motor vehicles.  
NTB-000-161 7.4. Costly procedures 2009-07-27 Tanzania: Ministry of Trade Tanzania Resolved
2016-06-15
View
Complaint: A number of non-tariff fees are levied on agricultural and manufactured products. Examples are: inspection fees, Warehousing fees; Air Cargo levy; Agricultural Cess, Livestock Marketing Cess, landing and parking fees, seaman's levy and farm support fees.  
Resolution status note: The SADC Sub Committee on Trade facilitation carried out a review of long standing NTBs and found out that the various fees identified above, i.e. inspection fees, warehousing fees; air cargo levy; agricultural cess, livestock marketing cess, landing and parking fees, seaman's levy and farm support fees were acceptable as long as they are for the services rendered and are also provided for in the national legislations.
This is finding therefore resolves the NTB
 
NTB-000-162 8.7. Costly Road user charges /fees 2009-07-27 Tanzania: Ministry of Transport Tanzania Resolved
2011-07-28
View
Complaint: Registration and accreditation of transporters is too high, (Charge is USD 10,000 per company so that only capable and serious transporters are registered)  
Resolution status note: Tanzania Revenue Authority reported that TRA is responsible for issuing the transporter license and that the fees is only Ks 20 000.  
NTB-000-165 8.7. Costly Road user charges /fees 2009-07-27 Tanzania: Dar-es-Salaam Port Tanzania Resolved
2012-06-15
View
Complaint: Dar es Salaam port charges are considered high although it is one of the best ports in the region. Registration and accreditation of transporters is high, In addition to the charges and logistics, transit bonds are bureaucratic and are treated differently in other SADC countries.  
Resolution status note: The 10th meeting of SADC Committee on Trade facilitaion agreed that the NTB was outdated & also that ‘charges’ had to be unpacked to enable comparison of all types of charges imposed at the port. It was noted that Dar es Salaam Port has special dispensations for transit cargo, which are not offered to cargo destined to Tanzania. According to the latest study by Tanzania, the Dar es Salaam port is the cheapest in the Region therefore this NTB was considered resolved.  
NTB-000-148 2.8. Lengthy and costly customs clearance procedures
Policy/Regulatory
2009-07-27 Zambia: Ministry of Trade Tanzania Resolved
2011-03-04
View
Complaint: Zambia licensing process just too long.  
Resolution status note: Zambia reported that the process only takes 24hours  
NTB-000-163 2.4. Import licensing
Policy/Regulatory
2009-07-27 Zambia: Ministry of Trade Tanzania Resolved
2011-03-04
View
Complaint: Licensing process just too long  
Resolution status note: Zambia reported that the process only takes 24hours  
NTB-000-175 1.1. Export subsidies
B6: Product identity requirement
2009-07-27 Zambia: Bureau of Standards Malawi Resolved
2011-03-04
View
Complaint: Zambia has placed standards requirements that sugar from Malawi be fortified with Vitamin A.  
Resolution status note: Zambia reported that all sugar for domestic consumption, be it imported or manufactured locally is supposed to be fortified with vitamin A.
 
1 2 3...5 6 7 8 9...38 39 40